|
Thrust Duct
|
Thrust Duct Construction
Make sure you use a line that will not stretch or move when laying out the foam for your duct.
One of the hardest parts of building the craft is wrapping the foam around the 1/8" ply. I had two friends help. I used 3 ratchet straps to hold it in place until the epoxy cured.
Here I show the cut I made in the foam before it is spray-foam attached to the deck.
I had completely forgotten to attach the elevator supports. All I had to do was cut out a slot, shape a 2x2 to fit, then shape with a grinder. Wow Repairing this will be easy!
|